Repairs Previous Next
Lake Washington Water Treatment Plant
Description of Work: Repair leaking cracks, joints and large diameter pipe penetrations in two CIP concrete water treatment structures by injection of hydrophilic urethane.
Client:
Lake Washington Water Treatment Plant
Subcontractor for:
Wharton-Smith Inc.